PRT- GrizzlyKote™ Epoxy |
Pipe Replacement |
|
COST |
NOT always less than re-pipe |
Normally more expensive Key Components of Re-pipe Cost:
|
DURATION |
2-3 days on average 4-5 days for 16-unit aparment building |
2-5 days (Average home, hotel room, or apartment- including mains)
NOTE: Water is back on at the end of each day |
COSMETIC |
ZERO or minimal impact | Wall and/or ceiling repair and paint |
LEAKS |
Permanently stopped |
Will recure IF metal pipes are used for re-pipe |
CORROSION |
Prevents further corrosion | Immediate Re-start IF metal pipes are used for re-pipe |
BACTERIA GROWTH |
Prevented Inside pipe system | May re-start IF metal pipes are used in re-pipe |
CALCIUM BUILDUP |
Prevented Inside pipe system | Can RAPIDLY recure IF metal pipes are used for re-pipe |
WARRANTY |
Typical- 10 years Unconditional or 75 year Conditional is option | Typical- 1 to 2 years |